Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Reiteralm Silver Jet

Line
Line

Cabin
Cabin

Line
Line

General information  
Place Pichl/Enns 
resort ?? 
Region Styria 
Country   
Name of lift Reiteralm Silver Jet 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 787 m
Height of mountain station 1392,50 m
Vertical rise 605,50 m
Route distance 1891,53 m
Horizontal length 1792,00 m
Average incline 33,79 %
Largest incline 72,18 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2770 Pers/h
Travel time 5,45 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 924 kW
Drive power (Operation) 758 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA III-8 LWI 
Seating leather 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 73 Stk
Cab distance 62,38 m
Cab interval 10,40 s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime winter 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/04/23
PHOTOS: ??

Lift-Statistics
21999 visit(s) since 30/06/05
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 7133
Place-ID: 241

https://www.seilbahntechnik.net/en/lifts/7133/datas.htm