Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Matschwitz

Line
Line

Line
Line

Mountain Station
Mountain Station

General information  
Place Tschagguns 
resort Grabs 
Region Vorarlberg 
Country   
Name of lift Matschwitz 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1986 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1491 m
Height of mountain station 1902 m
Vertical rise 411 m
Route distance 1420 m
Horizontal length ?? m
Average incline 30,4 %
Largest incline 66,7 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2880 Pers/h
Travel time 4,5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system Siemens 
Power control system Siemens 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 345 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DS 104 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 126 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way 8 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13/05/22
PHOTOS: ??

Lift-Statistics
13273 visit(s) since 18/01/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 848
Place-ID: 35

https://www.seilbahntechnik.net/en/lifts/848/datas.htm