Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Quick Jet (Flutlichthang)

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Winterberg 
resort ?? 
Region North Rhine-Westphalia 
Country   
Name of lift Quick Jet (Flutlichthang) 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 86 m
Route distance 351 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 5 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 1,9 min
Driving speed line 3,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control EEI 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 32 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/08/15
PHOTOS: ??

Lift-Statistics
13120 visit(s) since 24/11/05
Last visit 26/03/24

LIFT-WORLD IDs
Lift-ID: 8634
Place-ID: 1985

https://www.seilbahntechnik.net/en/lifts/8634/datas.htm