Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Salamander Express










General information  
Place Puchberg am Schneeberg 
resort ?? 
Region Lower Austria 
Country   
Name of lift Salamander Express 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 840 m
Height of mountain station 1210 m
Vertical rise 370 m
Route distance 1140 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 104G 
Cab manufacturer Doppelmayr 
Cab model 4E98/A 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 40 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 5 months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/03/24
PHOTOS: ??

Lift-Statistics
7005 visit(s) since 04/12/05
Last visit 17/04/24

LIFT-WORLD IDs
Lift-ID: 8690
Place-ID: 515

https://www.seilbahntechnik.net/en/lifts/8690/datas.htm