Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Mont Joly

Complete View of the lift
Complete View of the lift

Valley Station
Valley Station

Mountain Station
Mountain Station

General information  
Place Saint-Nicolas-de-Véroce 
resort Evasion Mont Blanc 
Region Rhône-Alpes 
Country   
Name of lift Mont Joly 
Type 3-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1983 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1722 m
Height of middle station(s) ?? m
Height of mountain station 2366 m
Vertical rise 644 m
Route distance 1753 m
Horizontal length 1630 m
Average incline 40 %
Largest incline 69 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 3,4 m
Trackwidth line ?? m
Trackwidth return 3,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time ?? min
Driving speed line 2,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 316 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Montaz Mautino 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 189 Stk
Cab distance 18,5 m
Cab interval 7,4 s


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/09/22
PHOTOS: ??

Lift-Statistics
5600 visit(s) since 07/04/07
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 9804
Place-ID: 1200

https://www.seilbahntechnik.net/en/lifts/9804/datas.htm