Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Grafenberg-Express I

Line
Line

Line
Line

Line
Line

General information  
Place Wagrain 
resort ?? 
Region Salzburg 
Country   
Name of lift Grafenberg-Express I 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 862,6 m
Height of mountain station 1236,3 m
Vertical rise 373,7 m
Route distance 947,91 m
Horizontal length 843,22 m
Average incline 44,32 %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,97 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 534 kW
Drive power (Operation) 397 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model ?? 
Seating leather 
Seat heater yes 
Heater yes 
Aircon no 
Persons per cab
Number of cabs 39 Stk
Cab distance 60 m
Cab interval 12 s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/02/22
PHOTOS: ??

Lift-Statistics
21303 visit(s) since 26/09/09
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 14112
Place-ID: 213

https://www.seilbahntechnik.net/en/lifts/14112/datas.htm