Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6/8-CGD Moosfluh I

Middle Station
Middle Station

Line
Line

General information  
Place Riederalp 
resort Aletsch Arena 
Region Valais 
Country   
Name of lift Moosfluh I 
Type 6/8-CGD 
Lift manufacturer Garaventa 
Year of construction 2015 
Commissioning date 5 Dec 2015 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1885 m
Height of mountain station 2207 m
Vertical rise 322 m
Route distance 1083 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 396 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 
Bubble colour blue 
Seating leather 
Seat heater no 
Persons per cab 6/8 
Number of cabs 68 (18) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 20 %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit ?? 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 3 Feb 2026
PHOTOS: ??

Lift-Statistics
8059 visit(s) since 22 Oct 2016
Last visit 17 Feb 2026

LIFT-WORLD IDs
Lift-ID: 18153
Place-ID: 2105

https://www.seilbahntechnik.net/en/lifts/18153/datas.htm