Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Teufeltalbahn

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Gerlos 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Teufeltalbahn 
Type 4-CLF 
Lift manufacturer Poma 
Year of construction 1998 
Commissioning date 12 / 1998 
Date of closing down 14/04/24 
Date of pull down 30/04/24 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2040 m
Height of mountain station 2278 m
Vertical rise 238 m
Route distance 1043 m
Horizontal length 1004 m
Average incline 24,00 %
Largest incline 64,00 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,9 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 7,24 min
Driving speed line 2,6 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 237 kW
Drive power (Operation) 189 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 110 Stk
Cab distance 19,2 m
Cab interval 8 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/05/24
PHOTOS: ??

Lift-Statistics
18762 visit(s) since 30/08/03
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 2010
Place-ID: 66

https://www.seilbahntechnik.net/en/lifts/2010/datas.htm