Lift-Database » Lifts in the world
18-FUC Pilgrim Monument
General information | |
---|---|
Place | Provincetown |
resort | ?? |
Region | Massachusetts |
Country | |
Name of lift | Pilgrim Monument |
Type | 18-FUC |
Lift manufacturer | Inauen-Schätti |
Year of construction | 2021 |
Commissioning date | 04 / 2022 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | ?? m |
Height of mountain station | ?? m |
Vertical rise | 24 m |
Route distance | 44 m |
Horizontal length | 37 m |
Average incline | 73,3 % |
Largest incline | ?? % |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 360 Pers/h |
Travel time | ?? min |
Driving speed line | 1,2 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 37 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | ?? |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | ?? |
Cab model | ?? |
Seating | ?? |
Seat heater | ?? |
Heater | ?? |
Aircon | ?? |
Persons per cab | 18 |
Number of cabs | 1 Stk |
Carriage Operator | ?? |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Length of counter-rope | ?? m |
Total weight of haul rope | ?? t |
Total weight of counter-rope | ?? t |
Haul rope diameter | ?? mm |
Counter-rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Nominal strength of counter-rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Breaking strength of counter-rope | ?? kN |
Tensionstation haulrope | ?? |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Construction costs | ?? USD |
Currency (Construction costs) | United States dollar |
Construction period | ?? months |
Seasontime | ?? |
Type of turnout | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 09/04/23
PHOTOS: ??
Lift-Statistics
835 visit(s) since 09/04/23
Last visit 07/10/24
LIFT-WORLD IDs
Lift-ID: 22347
Place-ID: 3311
https://www.seilbahntechnik.net/en/lifts/22347/datas.htm
Datas: 09/04/23
PHOTOS: ??
Lift-Statistics
835 visit(s) since 09/04/23
Last visit 07/10/24
LIFT-WORLD IDs
Lift-ID: 22347
Place-ID: 3311
https://www.seilbahntechnik.net/en/lifts/22347/datas.htm