General information  
Place Mieders 
resort ?? 
Region Tyrol 
Country   
Name of lift Hochserles 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2003 
Commissioning date 2003 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 963,82 m
Height of mountain station 1610,12 m
Vertical rise 646,3 m
Route distance 1974,49 m
Horizontal length 1861,36 m
Average incline 34,72 %
Largest incline 54,06 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 6,8 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 570 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Sigma 
Cab model DIAMOND - C8D210 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 32 Stk
Cab distance 191,2 m
Cab interval 40 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 2,75 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/04/22
PHOTOS: ??