Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Schartenkogel-Express



General information  
Place Tulfes 
resort ?? 
Region Tyrol 
Country   
Name of lift Schartenkogel-Express 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2026 
Commissioning date 12 / 2026 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 548,70 m
Route distance 1781,91 m
Horizontal length 1682,40 m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time ?? min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab 6 
Number of cabs ?? Stk
Cab distance 64,80 m
Cab interval 10,80 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet ?? 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Nov 15, 2026
PHOTOS: ??

Lift-Statistics
339 visit(s) since Sep 18, 2026
Last visit Nov 23, 2026

LIFT-WORLD IDs
Lift-ID: 27024
Place-ID: 574

https://www.seilbahntechnik.net/en/lifts/27024/datas.htm