Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Speiereckbahn

Line
Line

Pillars
Pillars

Line
Line

General information  
Place St. Michael im Lungau 
resort Lungo 
Region Salzburg 
Country   
Name of lift Speiereckbahn 
Type 2-CLF 
Lift manufacturer Swoboda 
Year of construction 1978 
Commissioning date 1978 
Date of closing down 2011 
Date of pull down 2011 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1101 m
Height of middle station(s) 1353 m
Height of mountain station 1919 m
Vertical rise 818 m
Route distance 2260 m
Horizontal length 2101 m
Average incline 38,90 %
Largest incline 66,80 %
Number of pillars 26 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 875 Pers/h
Travel time 15,5 min
Driving speed line 2,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/09/24
PHOTOS: ??

Lift-Statistics
12269 visit(s) since 14/10/03
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 3098
Place-ID: 350

https://www.seilbahntechnik.net/en/lifts/3098/datas.htm