Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Ochsenweide

Mountain Station
Mountain Station

Pylone
Pylone

Mountain Station
Mountain Station

General information  
Place Obereggen 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Ochsenweide 
Type 8-MGD 
Lift manufacturer Agamatic 
Year of construction 1999 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1540 m
Height of mountain station 1830 m
Vertical rise 290 m
Route distance 1301 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs ?? Stk
Cab distance 60 m
Cab interval 12 s
Garage type underground 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 22 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/01/23
PHOTOS: ??

Lift-Statistics
20584 visit(s) since 07/04/03
Last visit 31/10/24

LIFT-WORLD IDs
Lift-ID: 39
Place-ID: 1495

https://www.seilbahntechnik.net/en/lifts/39/datas.htm