Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  25-AT Karwendelbahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Mittenwald 
resort ?? 
Region Bavaria 
Country   
Name of lift Karwendelbahn 
Type 25-AT 
Lift manufacturer PHB 
Year of construction 1967 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 932,6 m
Height of mountain station 2244,3 m
Vertical rise 1311,7 m
Route distance 2485 m
Horizontal length ?? m
Average incline 62,5 %
Largest incline 92,7 %
Number of pillars 2 Stk
Greatest spanwidth 1039 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 350 Pers/h
Travel time 7 min
Driving speed line 10 m/s
Speed on towers 10 m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 210 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Carvatech 
Cab model ?? 
Heater ?? 
Aircon ?? 
Persons per cab 25 
Number of cabs 2 Stk
Carriage Operator yes 


rope data  
Rope manufacturer ?? 
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter 48 mm
Traction rope diameter 23 mm
Counter-rope diameter 26 mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope 247520 kN
Breaking strength of traction rope 37640 kN
Breaking strength of counter-rope 47250 kN
Tensionstation carryingrope Valley station 
Tensionstation tractionrope ?? 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? DEM
Currency (Construction costs) Deutsche Mark 
Construction period 18 months
Seasontime ❄ ☀ all-season 
xxxx hier text hin xxxx yes 
Moving platform no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16.02.2024
PHOTOS: ??

Lift-Statistics
18875 visit(s) since 21.11.2002
Last visit 10.05.2025

LIFT-WORLD IDs
Lift-ID: 811
Place-ID: 1893

https://www.seilbahntechnik.net/en/lifts/811/datas.htm