Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Aebi

Mountain station
Mountain station

Line
Line

Line
Line

General information  
Place Adelboden 
resort Adelboden-Lenk 
Region Berne 
Country   
Name of lift Aebi 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 1999 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1535 m
Height of mountain station 1972 m
Vertical rise 437 m
Route distance 1412 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime winter 
Situation of entrance 180° 
Situation of exit ?? 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/04/23
PHOTOS: ??

Lift-Statistics
15179 visit(s) since 14/12/02
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 9
Place-ID: 128

https://www.seilbahntechnik.net/en/lifts/9/datas.htm