Lift-Database » Lifts in the world
Dorf Tyrol, Dorf Tirol, Tirolo
Height of valley station: 318,88 m
Travel time: 5 min
Height of mountain station: 487,72 m
Driving speed line: 1,5 m/s
Route distance: 429,84 m
Maximum capacity: 249 Pers/h
Year of construction: 1987
Lift manufacturer: Leitner
Seasontime: ☀
Height of valley station: 697 m
Travel time: 4 min
Height of mountain station: 1370 m
Driving speed line: 12,0 m/s
Route distance: 1830,67 m
Maximum capacity: 275 Pers/h
Year of construction: 1973
Lift manufacturer: Hölzl
Seasontime: ❄ ☀
Places within a radius |
---|
Schenna / Scenna |
Algund / Lagundo |
Hafling / Avelengo |
Partschins / Parcines |
Lana |
Burgstall / Postal |
LIFT-WORLD IDs
Place-ID: 1392
Place-ID: 1392