Lift-Database » Lifts in the world
Neudorf
Height of valley station: 713 m
Travel time: ?? min
Height of mountain station: 820 m
Driving speed line: 2,50 m/s
Route distance: 555 m
Maximum capacity: 887 Pers/h
Year of construction: 2004
Lift manufacturer: Doppelmayr
Seasontime: ❄
Places within a radius |
---|
Baerenstein |
Crottendorf |
Oberwiesenthal |
Loučná pod Klínovcem |
Boží Dar |
Měděnec |
LIFT-WORLD IDs
Place-ID: 1900
Place-ID: 1900