Lift-Database » Lifts in the world
Tongyeong, 통영시
Height of valley station: ?? m
Travel time: 9 min
Height of mountain station: ?? m
Driving speed line: 4,0 m/s
Route distance: 1975 m
Maximum capacity: 1800 Pers/h
Year of construction: 2008
Lift manufacturer: Hyosung
Seasontime: ??
Height of valley station: ?? m
Travel time: ?? min
Height of mountain station: ?? m
Driving speed line: 3,0 m/s
Route distance: 439 m
Maximum capacity: 1600 Pers/h
Year of construction: 2016
Lift manufacturer: Doppelmayr
Seasontime: ??
LIFT-WORLD IDs
Place-ID: 828
Place-ID: 828