Splicing at the Fellhornbahn II
-
Works on the first end of rope
-
Works on the first end of ropeSo that the rope doesn´t untwist at the cut-off point, it gets fixed with a piece of wire.
-
-
Works on the first end of rope
-
-
-
Works on the first end of ropeWithout teamwork nothing goes here at all. Again and again the rope must be raised, in order to turn the lacing out. The whole three times per rope end and on a length of 30m.
-
Works on the first end of rope
-
-
-
-
Works on the first end of rope
-
Works on the first end of ropeShort before the rope have all wires, the three remaining wires are cut.
-
-
Works on the first end of ropeNow both ends of the rope have three lacings up to 30m and three lacings, incl. plastic core, up to 1m length.
The red markers on the lacings are only for better orientation. -