Appareils - Base de donnée

Installations dans le monde


28-BGD Peak2Peak Gondola












Informations pour personnes à mobilité réduite
Désolé, aucune information disponible.

Particularités
Longest Free Span for lift of its kind in the world; Longest Lift system (Wizard Express, Solar Coaster Express, Peak to Peak Gondola, Whistler Village Gondola); Highest lift of it's kind

The Peak 2 Peak Gondola opened up this morning (December 12, 2008) at 11:00:01 AM, Whistler Time. The weather was foggy, but the ride was smooth. The VIP\\\\\\\'s that attended the event were:
Dave Brownlie - WB Operating Manager
Nancy Greene - Olympic Skiier
Hon. Kevin Falcon - Transportation minister
and more

The Gondola will now run daily from 9:00 am to 5:00pm. The gondola will be closed for scheduled maintenance from April 27 to June 5, 2009. The lift will re-open for summer operations on June 6, 2009. Up and downloading access on Blackcomb will resume June 20, 2009.

ATTN: The Sky Cabins are pulled off the line in both the Whistler and Blackcomb terminals EVERY night after service ends due to high winds.

Informations générales  
Station Whistler
resort
Region British Columbia
Pays CA Canada
Nom de la remontée Peak2Peak Gondola 
Type 28-BGD 
Constructeur de l'installation Doppelmayr 
Année de construction 2008 
Commissioning date ??

geometric data  
Altitude aval 1870 m
Altitude amont 1834 m
Vertical rise 36 m
Route distance 4516 m
Longueur horizontale 4400 m
Pente moyenne ?? %
Pente maximale ?? %
Nombre de pylônes de ligne 4 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 16 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Débit maximum 2050 Pers/h
Travel time 11 min
Driving speed line 7,5 m/s

rope data  
Rope manufacturer Fatzer 
Length of carrying rope ?? m
Length of traction rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Carrying rope diameter ?? mm
Traction rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Number of carrying rope ?? Stk
Tensionstation carryingrope ??
Tensionstation tractionrope ??
Tension type
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Puissance du moteur (au démarrage) 1750 kW
Puissance du moteur (en service) 515 kW
Puissance de freinage ?? kW
Continuous brake power ?? kW
gare motrice gare amont
Type d'entraînement ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Type de pinces ??
Constructeur des véhicules CWA
Type de véhicules ZETA 30
Siège cuir
Seat heater Non
Heater ??
climatiseur ??
Nombre de places par véhicules 28 
Nombre total de véhicules 28 Stk
Espacement entre les véhicules 368 m
Cadencement des véhicules 49,2 s
Type de garage
Garages
Direction de marche pour le décyclage ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Sens de la montée droite
Construction costs ?? 
Currency (Construction costs) ?? 
Durée de construction 18 mois
Saison d’exploitation ??
Appareil de sauvetage ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




Vous devez être identifié pour pouvoir consulter cette information !



Updates
Données: 25/06/2013 19:43:00
Photos: 22/12/2008 18:32:00

Support
Wrong data or something is missing?
Nous soutenir!
Statistiques de l'installation
14681 visit(s) since 23/09/2008
Dernière visite 22/08/2019