Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Appareils - Base de donnée » Installations dans le monde

  85-AT Sceniscender

The gondola
The gondola

Valley station
Valley station

Line
Line

Informations générales  
Station Katoomba 
resort Blue Mountains 
Region New South Wales 
Pays   
Nom de la remontée Sceniscender 
Type 85-AT 
Constructeur de l'installation Doppelmayr 
Année de construction 2000 
Commissioning date ?? 


Informations pour personnes à mobilité réduite
Désolé, aucune information disponible.

Particularités
The Sceniscender is situated in the Blue Mountains Australia. It gives access to a rainforest in the valley, which has 2.4 kM of boardwalks. On site is also the steepest funicular in the world at 52 degrees and a second reversible which is currently being re-built to re-open in November 2004.

geometric data  
Altitude aval 739,5 m
Altitude amont 951,6 m
Vertical rise 215,5 m
Route distance 510 m
Longueur horizontale ?? m
Pente moyenne 46,9 %
Pente maximale 73,06 %
Nombre de pylônes de ligne 1 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 0,70 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Débit maximum 714 Pers/h
Travel time 2,36 min
Driving speed line 5,0 m/s
Speed on towers ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Puissance du moteur (au démarrage) 613 kW
Puissance du moteur (en service) 414 kW
Puissance de freinage ?? kW
Continuous brake power ?? kW
gare motrice gare amont 
Type d'entraînement ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Type de pinces ?? 
Constructeur des véhicules CWA 
Type de véhicules ?? 
Heater ?? 
climatiseur ?? 
Nombre de places par véhicules 85 
Nombre total de véhicules 1 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer Fatzer 
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter ?? mm
Traction rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope ?? 
Tensionstation tractionrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Construction costs ?? 
Currency (Construction costs) ?? 
Durée de construction 9 mois
Saison d’exploitation ??  
Carrying rope brake ?? 
Moving platform ?? 
Appareil de sauvetage ?? 
Integrated rescue system ?? 
Téléphérique autonome Non 
Asset number (Trail map) ?? 

Vous devez être identifié pour pouvoir consulter cette information !


Support
Wrong data or something is missing?
Nous soutenir!
Updates
Données: 5 nov. 2005
Photos: ??

Statistiques de l'installation
8204 visit(s) since 6 janv. 2003
Dernière visite 10 sept. 2025

LIFT-WORLD IDs
Lift-ID: 684
Station-ID: 96

https://www.seilbahntechnik.net/fr/lifts/684/datas.htm