Lift-Database » Lifts in the world
8-MGD Hohe Mutbahn I
Valley Station
Bottom Station
Line
General information | |
---|---|
Place | Obergurgl |
resort | Snow Card Tirol |
Region | Tyrol |
Country | |
Name of lift | Hohe Mutbahn I |
Type | 8-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2007 |
Commissioning date | 2007 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Through operation with Hohe Mut II during the winter. Common garage in the intermediary station. Bottom station length: UNI-G XL Top station length: UNI-G XL Sheave types: 420C (compression) and 501C (support) |
geometric data | |
---|---|
Height of valley station | 1910,4 m |
Height of mountain station | 2071,6 m |
Vertical rise | 161,2 m |
Route distance | 1016 m |
Horizontal length | 1016 m |
Average incline | 16,2 % |
Largest incline | ?? % |
Number of pillars | 7 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 5,20 m |
Trackwidth line | 5,20 m |
Trackwidth return | 5,20 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2400 Pers/h |
Travel time | 3,9 min |
Driving speed line | 6 m/s |
Driving speed station | 0,3 m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 2 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | mechanical |
cabins data | |
---|---|
Grip type | DT 108 |
Cab manufacturer | CWA |
Cab model | OMEGA IV-8 LWI |
Seating | leather |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 8 |
Number of cabs | 39 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | underground |
Garage place | mountain station |
Garage direction | forward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | 7 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | 6 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | no |
Integrated rescue system | no |
Rope position control | yes |
Asset number (Trail map) | ?? |
Updates
Datas: 02/05/23
PHOTOS: ??
Lift-Statistics
17468 visit(s) since 17/11/07
Last visit 16/11/24
LIFT-WORLD IDs
Lift-ID: 12171
Place-ID: 60
https://www.seilbahntechnik.net/en/lifts/12171/datas.htm
Datas: 02/05/23
PHOTOS: ??
Lift-Statistics
17468 visit(s) since 17/11/07
Last visit 16/11/24
LIFT-WORLD IDs
Lift-ID: 12171
Place-ID: 60
https://www.seilbahntechnik.net/en/lifts/12171/datas.htm