Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Hohe Mutbahn I

Valley Station
Valley Station

Bottom Station
Bottom Station

Line
Line

General information  
Place Obergurgl 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Hohe Mutbahn I 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date 2007 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Hohe Mut II during the winter.
Common garage in the intermediary station.

Bottom station length: UNI-G XL
Top station length: UNI-G XL

Sheave types: 420C (compression) and 501C (support)

geometric data  
Height of valley station 1910,4 m
Height of mountain station 2071,6 m
Vertical rise 161,2 m
Route distance 1016 m
Horizontal length 1016 m
Average incline 16,2 %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,20 m
Trackwidth line 5,20 m
Trackwidth return 5,20 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,9 min
Driving speed line 6 m/s
Driving speed station 0,3 m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 39 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 7 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/05/23
PHOTOS: ??

Lift-Statistics
17465 visit(s) since 17/11/07
Last visit 16/11/24

LIFT-WORLD IDs
Lift-ID: 12171
Place-ID: 60

https://www.seilbahntechnik.net/en/lifts/12171/datas.htm