Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Untermarkter Alm










General information  
Place Imst 
resort ?? 
Region Tyrol 
Country   
Name of lift Untermarkter Alm 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2021 
Commissioning date 17/12/21 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1040 m
Height of mountain station 1487 m
Vertical rise 452 m
Route distance 2323,72 m
Horizontal length 2274,63 m
Average incline 19,88 %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,40 m
Trackwidth line 6,40 m
Trackwidth return 6,40 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2000) Pers/h
Travel time 8 min
Driving speed line 6 m/s
Driving speed station 0,33 m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive 1 Stk
Drive power (Start) 671 kW
Drive power (Operation) 509 kW
Brake power 480 kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 42 (52) Stk
Cab distance 135 m
Cab interval 22,5 s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 4800 m
Total weight of haul rope 43,40 t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 7 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 3 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/03/22
PHOTOS: ??

Lift-Statistics
3697 visit(s) since 13/11/21
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 20806
Place-ID: 146

https://www.seilbahntechnik.net/en/lifts/20806/datas.htm