Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Untermarkter Alm





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Imst
resort
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Untermarkter Alm 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2021 
Commissioning date 17/12/21

geometric data  
Height of valley station 1040 m
Height of mountain station 1487 m
Vertical rise 452 m
Route distance 2324 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2000) Pers/h
Travel time 8 min
Driving speed line 6 m/s
Driving speed station 0,33 m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 4650 m
Total weight of haul rope 45,5 t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 7 m

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating leather
Seat heater no
Heater no
Aircon no
Persons per cab 10 
Number of cabs 42 (52) Stk
Cab distance 135 m
Cab interval 22,5 s
Garage type ground floor
Garage place mountain station
Garage direction backward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 20,500,000  EUR 
Currency (Construction costs) Euro 
Construction period 3 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/12/21 19:38:48
PHOTOS: ????

Lift-Statistics
382 visit(s) since 13/11/21
Last visit 16/01/22

LIFT-WORLD IDs
Lift-ID: 20806
Place-ID: 146

https://www.seilbahntechnik.net/en/lifts/20806/datas.htm