  8-MGD Sonnwendkopfbahn

Mountain station
Mountain station

Line
Line

Line
Line

General information  
Place Koenigsleiten 
resort ?? 
Region Salzburg 
Country   
Name of lift Sonnwendkopfbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date 2003 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1470 m
Height of middle station(s) ?? m
Height of mountain station 2035 m
Vertical rise 565 m
Route distance 1754 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,9 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type AK 680 
Cab manufacturer Swoboda 
Cab model ULTRA 8 S 
Seating polystyrene 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 49 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/03/24