Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Sonnwendkopfbahn


Mountain station
Mountain station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Koenigsleiten
resort Zillertal Arena
Region Salzburg
Country AT Austria, Österreich
Name of lift Sonnwendkopfbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ??

geometric data  
Height of valley station 1470 m
Height of middle station(s) ?? m
Height of mountain station 2035 m
Vertical rise 565 m
Route distance 1754 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 (2000) Pers/h
Travel time 4,9 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type AK 680
Cab manufacturer Swoboda
Cab model ULTRA 8 S
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 34 (44) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 05/01/10 21:37:00
PHOTOS: 19/03/06 14:43:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
18984 visit(s) since 20/07/03
Last visit 22/10/19

LIFT-WORLD IDs
Lift-ID: 2907
Place-ID: 67

https://www.seilbahntechnik.net/en/lifts/2907/datas.htm