Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B 6er Blitz Ganghofer


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Ehrwald
resort Ehrwalder Alm
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift 6er Blitz Ganghofer 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1996 
Commissioning date ??

geometric data  
Height of valley station 1280 m
Height of mountain station 1695 m
Vertical rise 415 m
Route distance 1640 m
Horizontal length ?? m
Average incline 26,20 %
Largest incline 60,00 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,50 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,47 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour
Seating Icolan
Seat heater yes
Persons per cab
Number of cabs 78 Stk
Cab distance 45 m
Cab interval 9,0 s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/12/13 22:02:00
PHOTOS: 24/03/04 18:22:23

Lift-Statistics
16249 visit(s) since 05/01/04
Last visit 29/07/21

LIFT-WORLD IDs
Lift-ID: 105
Place-ID: 85

https://www.seilbahntechnik.net/en/lifts/105/datas.htm