Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Mittelbergbahn


Valley station
Valley station

Mountain Station
Mountain Station

Middle station
Middle station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place St. Leonhard
resort Pitztaler Gletscher
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Mittelbergbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2006 
Commissioning date ??

geometric data  
Height of valley station 2685 m
Height of middle station(s) 3000 m
Height of mountain station 3290 m
Vertical rise 605 m
Route distance 2390 m
Horizontal length ?? m
Average incline 24,86 %
Largest incline 58,68 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2100 Pers/h
Travel time 9 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope 53 t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 68 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 28/11/08 16:03:00
PHOTOS: 03/12/06 19:01:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12241 visit(s) since 03/12/06
Last visit 20/10/19

LIFT-WORLD IDs
Lift-ID: 10710
Place-ID: 134

https://www.seilbahntechnik.net/en/lifts/10710/datas.htm