Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Combe à Médran - Tête des Vaux












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Verbier
resort Les 4 Vallées
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Combe à Médran - Tête des Vaux 
Type 6-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2006 
Commissioning date ??

geometric data  
Height of valley station 2223 m
Height of mountain station 2718 m
Vertical rise 495 m
Route distance 1510,56 m
Horizontal length 1390 m
Average incline 36,40 %
Largest incline 98,56 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,43 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Garaventa
Cab model 6E98/B
Bubble colour
Seating leather
Seat heater no
Persons per cab
Number of cabs 71 Stk
Cab distance 33,75 m
Cab interval 6,75 s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 03/02/19 15:20:52
PHOTOS: 30/07/07 21:51:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
4514 visit(s) since 11/01/07
Last visit 13/10/19

LIFT-WORLD IDs
Lift-ID: 10848
Place-ID: 227

https://www.seilbahntechnik.net/en/lifts/10848/datas.htm