  4-CLD/B Brdo



General information  
Place Cerkno 
resort ?? 
Region ?? 
Country   
Name of lift Brdo 
Type 4-CLD/B 
Lift manufacturer Girak 
Year of construction 1995 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Tower 5 Truss tower
Tower 6 Portal tower
At tower 6 the ropeway crosses the former DSB (Brdo) and between towers 11 and 12 it crosses the DSB Gric

geometric data  
Height of valley station 874 m
Height of mountain station 1200 m
Vertical rise 326 m
Route distance 1678 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 5,7 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control STG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 519 kW
Drive power (Operation) 420 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Girak 
Cab model ?? 
Bubble colour neutral 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 130 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/09/23
PHOTOS: ??

Lift-Statistics
4209 visit(s) since 02/03/07
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 10924
Place-ID: 2126

https://www.seilbahntechnik.net/en/lifts/10924/datas.htm