Lift-Database » Lifts in the world
8-MGD Černohorský Expres
Line
Station
Valley Station
General information | |
---|---|
Place | Janské Lázně |
resort | ?? |
Region | Královehradecký kraj |
Country | |
Name of lift | Černohorský Expres |
Type | 8-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2006 |
Commissioning date | 2006 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 694 m |
Height of mountain station | 1260 m |
Vertical rise | 566 m |
Route distance | 2307 m |
Horizontal length | 2230 m |
Average incline | 25,39 % |
Largest incline | 43,55 % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 5,2 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1485 (1900) Pers/h |
Travel time | 7,4 min |
Driving speed line | 6,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 689 kW |
Drive power (Operation) | 498 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | DT 108 |
Cab manufacturer | CWA |
Cab model | OMEGA III-8 |
Seating | carpet |
Seat heater | no |
Heater | ?? |
Aircon | ?? |
Persons per cab | 8 |
Number of cabs | 59 Stk |
Cab distance | 90 m |
Cab interval | 15 s |
Garage type | emergency rail |
Garage place | valley and mountain |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | 4680 m |
Total weight of haul rope | ?? t |
Haul rope diameter | 45 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 4 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 28/08/22
PHOTOS: ??
Lift-Statistics
18050 visit(s) since 17/02/07
Last visit 16/09/24
LIFT-WORLD IDs
Lift-ID: 10966
Place-ID: 181
https://www.seilbahntechnik.net/en/lifts/10966/datas.htm
Datas: 28/08/22
PHOTOS: ??
Lift-Statistics
18050 visit(s) since 17/02/07
Last visit 16/09/24
LIFT-WORLD IDs
Lift-ID: 10966
Place-ID: 181
https://www.seilbahntechnik.net/en/lifts/10966/datas.htm