Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Gratbahn





Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
longer hangars

General information  
Place Ischgl
resort Silvretta Arena

Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Gratbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date 2002

geometric data  
Height of valley station 2307 m
Height of mountain station 2625 m
Vertical rise 318 m
Route distance 970 m
Horizontal length ?? m
Average incline 34,92 %
Largest incline 67,08 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2350 Pers/h
Travel time 3,23 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 570 kW
Drive power (Operation) 480 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour neutral
Seating leather
Seat heater no
Persons per cab
Number of cabs 48 Stk
Cab distance ?? m
Cab interval 9,2 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet ??
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) B8 




This information are for members only visible!



Updates
Datas: 17/10/15 15:28:40
PHOTOS: 09/08/06 22:16:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
13005 visit(s) since 28/11/02
Last visit 21/10/19

LIFT-WORLD IDs
Lift-ID: 1108
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/1108/datas.htm