Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Sagnalonga

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Cesana Torinese 
resort Via Lattea 
Region Piemonte 
Country   
Name of lift Sagnalonga 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2006 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1537 m
Height of mountain station 2012 m
Vertical rise 474,85 m
Route distance 1655,67 m
Horizontal length 1554,00 m
Average incline 30,56 %
Largest incline 58,20 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 5,5 min
Driving speed line 5,00 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 390 kW
Drive power (Operation) 336 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A104C 
Cab manufacturer Doppelmayr 
Cab model 4E98 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 58 Stk
Cab distance 60,00 m
Cab interval 12,00 s
Garage type ?? 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ??  
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/10/15
PHOTOS: ??

Lift-Statistics
9953 visit(s) since 09/05/07
Last visit 23/11/24

LIFT-WORLD IDs
Lift-ID: 11303
Place-ID: 1356

https://www.seilbahntechnik.net/en/lifts/11303/datas.htm