Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


12-MGD Tannenheim-Prodalp


Line
Line

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Flums
resort Flumserberg
Region St. Gall
Country CH Switzerland, Confoederatio Helvetica
Name of lift Tannenheim-Prodalp 
Type 12-MGD 
Lift manufacturer Poma 
Year of construction 1992 
Commissioning date 1992

geometric data  
Height of valley station 1224,8 m
Height of mountain station 1576,20 m
Vertical rise 352 m
Route distance 1461 m
Horizontal length ?? m
Average incline 24,8 %
Largest incline 65,9 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,60 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 (3000) Pers/h
Travel time 4,9 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ABB 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 670 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Poma
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab 12 
Number of cabs 43 (54) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 03/10/17 21:06:09
PHOTOS: 28/12/03 14:52:00

Lift-Statistics
18565 visit(s) since 25/12/02
Last visit 26/05/20

LIFT-WORLD IDs
Lift-ID: 1156
Place-ID: 335

https://www.seilbahntechnik.net/en/lifts/1156/datas.htm