Lift-Database » Lifts in the world
4-CLD Jouvenceaux - Sarnas - Sportinia
Mountain station
Mountain station
Middle Station
General information | |
---|---|
Place | Sauze d'Oulx |
resort | Via Lattea |
Region | Piemonte |
Country | |
Name of lift | Jouvenceaux - Sarnas - Sportinia |
Type | 4-CLD |
Lift manufacturer | Leitner |
Year of construction | 2006 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1387 m |
Height of middle station(s) | 1911 m |
Height of mountain station | 2170,5 m |
Vertical rise | 783,5 m |
Route distance | 2513 m |
Horizontal length | ?? m |
Average incline | 31 % |
Largest incline | 60,9 % |
Number of pillars | 28 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 5,30 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1800 Pers/h |
Travel time | 8,35 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 960 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Leitner |
Cab model | ?? |
Seating | none |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | ?? Stk |
Cab distance | 41 m |
Cab interval | 8,2 s |
Garage type | underground |
Garage place | mountain station |
Garage direction | backward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Redaelli |
Length of haul rope | 5300 m |
Total weight of haul rope | 45,9 t |
Haul rope diameter | 48 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ?? |
Situation of entrance | parallel |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 22/08/21
PHOTOS: ??
Lift-Statistics
13495 visit(s) since 07/08/07
Last visit 23/11/24
LIFT-WORLD IDs
Lift-ID: 11755
Place-ID: 1588
https://www.seilbahntechnik.net/en/lifts/11755/datas.htm
Datas: 22/08/21
PHOTOS: ??
Lift-Statistics
13495 visit(s) since 07/08/07
Last visit 23/11/24
LIFT-WORLD IDs
Lift-ID: 11755
Place-ID: 1588
https://www.seilbahntechnik.net/en/lifts/11755/datas.htm