Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Weitmoserbahn










General information  
Place Bad Hofgastein 
resort ?? 
Region Salzburg 
Country   
Name of lift Weitmoserbahn 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1831 m
Height of mountain station 2080 m
Vertical rise 249 m
Route distance 933 m
Horizontal length 899 m
Average incline 27,7 %
Largest incline 50,00 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2656 Pers/h
Travel time 3,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control STG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 392 kW
Drive power (Operation) 317 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A108 
Cab manufacturer Doppelmayr 
Cab model 6E98 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 52 Stk
Cab distance 40 m
Cab interval 8,13 s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 1934 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/06/23
PHOTOS: ??

Lift-Statistics
20426 visit(s) since 05/06/03
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 120
Place-ID: 245

https://www.seilbahntechnik.net/en/lifts/120/datas.htm