Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Top Schermer 3000


Mountain Station
Mountain Station

Track
Track

Track
Track


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Hochgurgl
resort Obergurgl-Hochgurgl
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Top Schermer 3000 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2007 
Commissioning date ??

geometric data  
Height of valley station 2422 m
Height of mountain station 2922 m
Vertical rise 500 m
Route distance 1913 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2393 Pers/h
Travel time 5,74 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 670 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type LPA
Cab manufacturer Sigma
Cab model DIAMOND - C8S210
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab
Number of cabs 63 Stk
Cab distance 72,2 m
Cab interval 12 s
Garage type ground floor
Garage place mountain station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 38 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 09/12/16 21:08:51
PHOTOS: 23/11/08 09:15:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11194 visit(s) since 17/11/07
Last visit 21/09/19

LIFT-WORLD IDs
Lift-ID: 12182
Place-ID: 61

https://www.seilbahntechnik.net/en/lifts/12182/datas.htm