Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Geils - Lavey












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Adelboden
resort Adelboden-Lenk
Engstligenalp
Region Berne
Country CH Switzerland, Confoederatio Helvetica
Name of lift Geils - Lavey 
Type 4-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2007 
Commissioning date ??

geometric data  
Height of valley station 1716 m
Height of mountain station 2198,55 m
Vertical rise 482,5 m
Route distance 1637,7 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 462 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 104
Cab manufacturer Doppelmayr
Cab model 4E98/B
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  CHF 
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ??
Situation of entrance 180°
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/02/21 08:08:52
PHOTOS: 15/03/14 21:42:00

Lift-Statistics
9654 visit(s) since 18/11/07
Last visit 24/09/21

LIFT-WORLD IDs
Lift-ID: 12196
Place-ID: 128

https://www.seilbahntechnik.net/en/lifts/12196/datas.htm