Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  120-FUC Schlossalmbahn I

Line
Line

Cabin
Cabin

Line
Line

General information  
Place Bad Hofgastein 
resort ?? 
Region Salzburg 
Country   
Name of lift Schlossalmbahn I 
Type 120-FUC 
Lift manufacturer Waagner Biro 
Year of construction 1964/84 
Commissioning date 20/09/64 
Date of closing down 02/04/18 
Date of pull down 03/04/18 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 843 m
Height of mountain station 1302 m
Vertical rise 459 m
Route distance 1251 m
Horizontal length 1175 m
Average incline 37,75 %
Largest incline 46,63 %
Trackwidth drive ?? m
Trackwidth line 1,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1660 Pers/h
Travel time 3,51 min
Driving speed line 8,5 m/s

electrical data  
Electrical control BBC 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater yes 
Aircon no 
Persons per cab 120 
Number of cabs 2 Stk
Carriage Operator yes 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter 38 mm
Counter-rope diameter 16 mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 14 months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13/02/23
PHOTOS: ??

Lift-Statistics
26560 visit(s) since 02/05/03
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 1225
Place-ID: 245

https://www.seilbahntechnik.net/en/lifts/1225/datas.htm