Lifts in the world


120-FUC Schlossalm


Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Bad Hofgastein
resort Ski amadé

Region Salzburg
Country AT Austria, Österreich
Name of lift Schlossalm 
Type 120-FUC 
Lift manufacturer Waagner Biro 
Year of construction 1964/84 
Commissioning date 20/09/64
Date of closing down 02/04/18
Date of pull down 03/04/18

geometric data  
Height of valley station 843 m
Height of mountain station 1302 m
Vertical rise 459 m
Route distance 1251 m
Horizontal length 1175 m
Average incline 37,75 %
Largest incline 46,63 %
Trackwidth drive ?? m
Trackwidth line 1,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1660 Pers/h
Travel time 3,51 min
Driving speed line 8,5 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter 38 mm
Counter-rope diameter 16 mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control BBC 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Gangloff
Cab model ??
Seating ??
Seat heater no
Heater yes
Aircon no
Persons per cab 120 
Number of cabs 2 Stk
Carriage Operator ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ??  ATS 
Currency (Construction costs) Austrian schilling 
Construction period 14 months
Seasontime ❄ ☀ all-season
Type of turnout ??
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/03/20 21:45:13
PHOTOS: 31/12/03 16:49:00

Lift-Statistics
19547 visit(s) since 02/05/03
Last visit 20/10/20

LIFT-WORLD IDs
Lift-ID: 1225
Place-ID: 245

https://www.seilbahntechnik.net/en/lifts/1225/datas.htm