Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Alm Express


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Sand in Taufers / Campo Tures
resort Speikboden
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Alm Express 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date 15/12/07

geometric data  
Height of valley station 1853 m
Height of mountain station 2003 m
Vertical rise 150 m
Route distance 653 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 2,16 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 300 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type A108
Cab manufacturer CWA
Cab model ??
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 29 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system ??
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 17/09/16 21:38:59
PHOTOS: 17/12/11 12:28:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5917 visit(s) since 15/12/07
Last visit 24/08/19

LIFT-WORLD IDs
Lift-ID: 12331
Place-ID: 1580

https://www.seilbahntechnik.net/en/lifts/12331/datas.htm