Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-MGD Dias


Valley station
Valley station

Line
Line





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Kappl
resort Ski Resort Kappl


Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Dias 
Type 4-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1987 
Commissioning date 1987

geometric data  
Height of valley station 1175 m
Height of mountain station 1830 m
Vertical rise 655 m
Route distance 1488 m
Horizontal length ?? m
Average incline 48,70 %
Largest incline 75,00 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 5,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 420 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DS 104
Cab manufacturer Swoboda
Cab model Austro Panorama 4
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 78 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 57,000,000  ATS 
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 07/03/20 14:20:15
PHOTOS: 06/08/06 09:58:00

Lift-Statistics
16722 visit(s) since 29/12/02
Last visit 13/07/20

LIFT-WORLD IDs
Lift-ID: 1243
Place-ID: 10

https://www.seilbahntechnik.net/en/lifts/1243/datas.htm