Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Tête des Verds

Valley Station
Valley Station

Valley Station
Valley Station

Valley Station
Valley Station

General information  
Place Flaine 
resort Grand Massif 
Region Rhône-Alpes 
Country   
Name of lift Tête des Verds 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1585 m
Height of middle station(s) ?? m
Height of mountain station 2110 m
Vertical rise 525 m
Route distance 1814 m
Horizontal length 1736 m
Average incline 31 %
Largest incline 98 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3100 Pers/h
Travel time 6 min
Driving speed line 5,25 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 890 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A108C 
Cab manufacturer Doppelmayr 
Cab model 6E98 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 108 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/11/09
PHOTOS: ??

Lift-Statistics
11793 visit(s) since 15/01/08
Last visit 05/12/24

LIFT-WORLD IDs
Lift-ID: 12444
Place-ID: 1020

https://www.seilbahntechnik.net/en/lifts/12444/datas.htm