Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Roc des Trois Marches II


Valley Station
Valley Station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Les Menuires
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Roc des Trois Marches II 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2007 
Commissioning date 2007

geometric data  
Height of valley station 2293 m
Height of mountain station 2699 m
Vertical rise 406 m
Route distance 1341 m
Horizontal length ?? m
Average incline 32 %
Largest incline 62 %
Number of pillars 15 Stk
Greatest spanwidth 165 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 (2800) Pers/h
Travel time 4,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) 620 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type LPA
Cab manufacturer Leitner
Cab model ??
Bubble colour neutral
Seating leather
Seat heater no
Persons per cab
Number of cabs 59 (75) Stk
Cab distance 49 (38) m
Cab interval 9,8 (7,6) s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 33 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 31/12/16 15:22:32
PHOTOS: 04/05/12 21:42:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5180 visit(s) since 22/03/08
Last visit 16/09/19

LIFT-WORLD IDs
Lift-ID: 12762
Place-ID: 1109

https://www.seilbahntechnik.net/en/lifts/12762/datas.htm