Lift-Database » Lifts in the world
6-CLD/B Iselerbahn



Valley station
General information | |
---|---|
Place | Oberjoch |
resort | ?? |
Region | Bavaria |
Country | ![]() |
Name of lift | Iselerbahn |
Type | 6-CLD/B |
Lift manufacturer | Doppelmayr |
Year of construction | 2001 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1160 m |
Height of mountain station | 1559 m |
Vertical rise | 399 m |
Route distance | 1443 m |
Horizontal length | 1375 m |
Average incline | 29,0 % |
Largest incline | ?? % |
Number of pillars | 14 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 6,1 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2400 (3000) Pers/h |
Travel time | 6 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 752 kW |
Drive power (Operation) | 563 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | DT 108 |
Cab manufacturer | Doppelmayr |
Cab model | 6E98/B |
Bubble colour | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 6 |
Number of cabs | 70 (86) Stk |
Cab distance | 45 (36) m |
Cab interval | 9 (7,2) s |
Garage type | ground floor |
Garage place | valley station |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 48 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 4 months |
Seasontime | ?? |
Situation of entrance | parallel |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 18 Sept 2013
PHOTOS: ??
Lift-Statistics
11706 visit(s) since 5 Dec 2002
Last visit 10 May 2025
LIFT-WORLD IDs
Lift-ID: 129
Place-ID: 1721
https://www.seilbahntechnik.net/en/lifts/129/datas.htm
Datas: 18 Sept 2013