Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD Grands Vans

Mountain station
Mountain station

Valley station
Valley station




General information  
Place Flaine 
resort Grand Massif 
Region Rhône-Alpes 
Country   
Name of lift Grands Vans 
Type 8-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1678 m
Height of mountain station 2208 m
Vertical rise 529 m
Route distance 1803 m
Horizontal length 1724 m
Average incline 31 %
Largest incline 84 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,1 m
Trackwidth line 7,2 m
Trackwidth return 7,2 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3481 Pers/h
Travel time 6 min
Driving speed line 4,7 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 1126 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A108 
Cab manufacturer Doppelmayr 
Cab model 8E98 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 99 Stk
Cab distance 19,26 m
Cab interval 13,09 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11 Jan 2025
PHOTOS: ??

Lift-Statistics
16752 visit(s) since 11 Mar 2005
Last visit 6 Jul 2025

LIFT-WORLD IDs
Lift-ID: 13
Place-ID: 1020

https://www.seilbahntechnik.net/en/lifts/13/datas.htm