Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Tougnète 2


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Meribel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Tougnète 2 
Type 6-CLD/B 
Lift manufacturer Poma 
Year of construction 2007 
Commissioning date 2007

geometric data  
Height of valley station 1909 m
Height of mountain station 2400 m
Vertical rise 491 m
Route distance 1550 m
Horizontal length ?? m
Average incline 31 %
Largest incline 60 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3240 Pers/h
Travel time 4,7 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 700 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer ??
Cab model ??
Bubble colour neutral
Seating leather
Seat heater no
Persons per cab
Number of cabs 90 Stk
Cab distance 36,8 m
Cab interval 6,7 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Situation of entrance parallel
Situation of exit 90°
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 31/12/16 16:51:31
PHOTOS: 04/06/12 20:52:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6082 visit(s) since 10/06/08
Last visit 15/09/19

LIFT-WORLD IDs
Lift-ID: 13006
Place-ID: 1130

https://www.seilbahntechnik.net/en/lifts/13006/datas.htm