Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Schilt

Line
Line

Line
Line

Line
Line

General information  
Place Grindelwald 
resort Jungfrau 
Region Berne 
Country   
Name of lift Schilt 
Type 4-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2002 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1949 m
Height of mountain station 2259 m
Vertical rise 310 m
Route distance 1623 m
Horizontal length ?? m
Average incline 22,2 %
Largest incline 57 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 5,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Garaventa 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 400 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 95 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/10/24
PHOTOS: ??

Lift-Statistics
12354 visit(s) since 19/04/03
Last visit 05/12/24

LIFT-WORLD IDs
Lift-ID: 1305
Place-ID: 1724

https://www.seilbahntechnik.net/en/lifts/1305/datas.htm