Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Salvenbahn II









Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Hopfgarten
resort SkiWelt
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Salvenbahn II 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2008 
Commissioning date 2008

geometric data  
Height of valley station 1178 m
Height of mountain station 1829 m
Vertical rise 645 m
Route distance 1728 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 5,67 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab
Number of cabs 47 Stk
Cab distance ?? m
Cab interval 14,4 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3,5 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) 22 




This information are for members only visible!



Updates
Datas: 03/09/17 15:23:06
PHOTOS: 31/12/08 22:24:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14410 visit(s) since 13/09/08
Last visit 15/10/19

LIFT-WORLD IDs
Lift-ID: 13182
Place-ID: 76

https://www.seilbahntechnik.net/en/lifts/13182/datas.htm