Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Holzalmbahn

Line
Line







General information  
Place Hochfuegen 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Holzalmbahn 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2001 
Commissioning date 2001 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1471 m
Height of mountain station 2170 m
Vertical rise 699 m
Route distance 1934 m
Horizontal length ?? m
Average incline 39,39 %
Largest incline 70,96 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 (2400) Pers/h
Travel time 6,5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 789 kW
Drive power (Operation) 677 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 71 (90) Stk
Cab distance ?? m
Cab interval 10,8 (9,0) s
Garage type underground 
Garage place mountain station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope 31,687 t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/01/24
PHOTOS: ??

Lift-Statistics
25629 visit(s) since 28/11/02
Last visit 26/12/24

LIFT-WORLD IDs
Lift-ID: 132
Place-ID: 149

https://www.seilbahntechnik.net/en/lifts/132/datas.htm